Tarmac Roadway, Leavenheath, Suffolk

Material used: Tarmac

Background: The original concrete surface was patchy and uneven.

Solution: The team regulated the base to achieve improved levels, then applied a new layer of tarmac.

Features: The work took two days and included full surface preparation. A simple design created a clean, modern look.

Outcome: The result was a smoother, more practical surface that refreshed the appearance of the entranceway.

Need help with surfacing work?
Contact us today.

GET A FREE QUOTE TODAY

Send us a message or call us: